CONSTRUCTION ACTIVITIES, PHOTOS AND SCHEDULE
January 2010
Progress Schedule as of January 7, 2010
January Construction Activities
BASIC BID WORK ITEMS
Jet Grouting
Completed jet grouting for Sewerline "A" pipe alignment from Pit A2 to Pit A1.
Sewerline pipe alignment from Pit A3 to Pit A4 in progress.
Pit A4 in progress.
Lay out and mark Pit A4 to Pit A8 jet grout columns for Sewerline "A" pipe alignment recently completed.
Additional jet grout crew mobilized to assist with jet grouting operations.
Jacking/Receiving Shaft for Microtunneling Work at SMH A2 (Pit A2)
Contractor re-aligned tunnel machine to microtunnel from Pit A2 to Pit A1.
Receiving Pit at SMH A1 (Pit A1)
Excavation work completed.
Exit ring installed.
Through Pit A3 (SMH A3)
Pipe jacking from Pit A2 to Pit A3 completed.
Exit ring sealed until SMH 3 is constructed.
Jacking/Receiving Pit A4 (SMH 4)
Sheetpiling recently completed.
Inclinometer casing recently installed.
Jet grouting in progress.
Microtunneling
Microtunneling from Pit A2 to Pit A1 completed.
PVC Pipe Installation
Scheduled to begin on the first week of January, 2010.
Existing Utility Relocation
Temporary relocation of 18-inch drainline outside of Pit A4 area completed.
Temporary relocation of 6-inch waterline outside of Pit A4 completed.
Temporary relocation of 6-inch sewerline completed.
ADDITIVE ALTERNATES - SEWERLINES A1, C, D, E, J AND K WORK ITEMS
Pothole Utilities
No potholing work done in December, 2009.
Existing Utilities Relocation
None.
Jet Grouting
Sewerline "E" pipe alignment at Kanuku Street, from Sta. 1+00 to 1+50+ in progress.
Sewerline "J" pipe alignment at Lii Ipo Street, from Sta. 7+78 to 8+68+ in progress.
Sewerline "K" pipe alignment in progress.